This repository has been archived on 2026-11-24. You can view files and clone it. You cannot open issues or pull requests or push a commit.
Files
radiance-sycl/tests
gearwave00001andClaude 39602c1c7b arch: audio pre_block feeds each branch the reference's norm (#14)
The reference AttnProjection (comfy/ldm/minimax/audio_vae.py:267) computes
proj(norm3(x)) + attn(norm1(x)), then + mlp(norm2(·)). The two 2048-wide
LayerNorms are not interchangeable: norm3's affine |w|mean is 0.60, norm1's
0.27, so the projection branch carries most of the block's magnitude (std 6.6
via norm3 vs 0.4 for the attention via norm1).

The device had them wired the other way -- it staged norm1 into the projection
and norm3 into the attention (qkv). Feeding the small-affine norm1 to the
projection shrank it 6.6 -> 1.8, collapsing the pre_block output and every
audio latent downstream to ~0.25-0.27x the reference.

Fix: stage norm1 for the attention (feeding p_op_qkv) and norm3 for the
projection (feeding p_op_proj). Both LN ops are the same ln(...,2048,b_apb->
b_aln3) kernel, so only the consumer wiring changed -- no kernel touched, no
re-convert (norm1.*/norm3.* weights are already loaded correctly).

Also adds a gated read-only R4D_ENC_SEL=amb readback (dbg_ae_amb = b_amb, the
f32 mean_proj input): the bf16 b_ax2 readback lags the arena and dumps garbage,
so b_amb is the reliable pre_block output used to localise the gap. Inert when
R4D_ENC_SEL is unset.

Device-verified (seed=7 tone, minimax-h3-ref2va-fp8, warm TP2): pre_block out
b_amb std 1.65 -> 6.43 (ratio 0.25 -> 0.97); final latent b_enca std 0.23 ->
0.546 vs reference 0.588 (ratio 0.39 -> 0.93), affine slope 0.385 -> 0.923,
R^2 0.975 -> 0.989. Host tier green (abi_layout/arch/ref/videos).

Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-19 17:15:30 -05:00
..
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-12 11:46:14 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-04 12:02:41 +02:00
2026-10-16 18:25:18 +02:00
2026-10-12 11:46:14 +02:00
2026-10-16 18:25:18 +02:00
2026-10-04 12:02:41 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-16 18:25:18 +02:00
2026-10-18 11:38:37 +02:00
2026-10-16 18:25:18 +02:00