This repository has been archived on 2026-11-24. You can view files and clone it. You cannot open issues or pull requests or push a commit.
Files
radiance-sycl/docs
AshlynandClaude Opus 5.5 c527863248 arch/gemma4: the dense arm on the second lane beside the routed arm, in a step that runs whole
The two feed-forward arms of a Gemma 4 MoE layer read the same normed residual and meet only at
the feed-forward join; issued one after the other, the dense arm's three launches -- gate_up,
act_mul, down, ~36 us under --profile-ops at a 26B-A4B decode step on 4x R9700 -- wait behind the
routed arm's ~120 every layer. At a few rows its GEMMs are latency-bound, nowhere near the
bandwidth the experts' GEMMs take.

In a step that runs whole -- every decode and verify step, and a prefill chunk too short to cut --
the dense arm now rides the second lane: issued behind a join from lane 0 (the attention join is
its producer), beside the routed arm on lane 0, and joined back before the feed-forward reduction
reads both. Its rows of the join buffer and the routed arm's are disjoint. No collective rides it,
so the reductions keep lane 0 here and lane 1 in a cut prefill chunk, and a step's collectives are
on one lane as before. h, gate_up, ffn and ff2 are named to rad_buf_concurrent. Off with the
overlap's switch, RADIANCE_GEMMA4_OVERLAP=0, which now keeps every step on one stream; a startup
note says which.

arch_test: a decode step issues the dense arm's three launches a layer on lane 1 and every
all-reduce on lane 0, two joins a layer, and nothing on the two lanes that touches a common
element unordered; a 4095-token chunk the same; the cut chunks keep lane 1 for their reductions
alone. GUIDE.md's switch and ARCHITECTURES.md say so.

Not yet run on the cards.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-12 14:40:04 -05:00
..
2026-10-06 21:36:24 +02:00
2026-10-08 18:22:08 +02:00
2026-10-08 18:22:08 +02:00
2026-10-04 12:02:41 +02:00
2026-10-08 18:22:08 +02:00
2026-10-08 18:22:08 +02:00
2026-10-07 12:37:53 +02:00